Maybe Your Team Isn’t Moving Because Your Requests Are Too Vague

When managers say “make it nice,” “create a rough draft,” or “think proactively,” employees may not move because the requirements are undefined.

Spot the anomalies
How reading tools work

Listen reads the article aloud. Speed read shows phrases in sequence at your chosen pace. Language practice compares available translations. Save keeps a bookmark in this browser; find it in the player’s bookmarks. Play this article as Breakout turns its own words into bricks for you to knock out.

Share this article
Maybe Your Team Isn’t Moving Because Your Requests Are Too Vague
AI-generated image
Advertisement
Advertisement

Maybe Your Team Isn’t Moving Because Your Requests Are Too Vague

Introduction: “Make It Nice” Is Not an Instruction

Workplaces often use vague instructions.

“Make it nice.”
“Make it suitable for younger employees.”
“Make it easy to understand.”
“Create a rough draft first.”
“Be proactive.”
“Just make something.”

These may sound flexible.

But for the person receiving the task, they can be dangerous.

The purpose, audience, deliverable, deadline, decision maker, priority, constraints, and scope are often unclear.

Then, after the employee creates something, the feedback becomes:

“That is not what I meant.”
“I wanted it to be more like this.”
“Normally, you should understand this.”
“You lack initiative.”
“You do not understand the purpose.”

But is that really the employee’s fault?

In many cases, the problem is not ability.

The problem is vague requirements.


Minimum Requirements People Need to Move

For someone to act, they need basic information.

Item Question
Purpose Why are we doing this?
Audience Who is this for?
Deliverable What should be completed?
Deadline When is it needed?
Decision maker Who approves it?
Priority Is this above or below existing work?
Constraints Time, people, tools, and restrictions
Scope What is included and what is not?

Without these, “make it nice” is not enough.

The employee can only guess.

And when the guess is later rejected, the problem is framed as lack of understanding.

That is not initiative.

That is requirement failure.


The Team Is Not Moving Because the Information Is Missing

Managers may say, “My team does not move.”

But from the employee’s side, it may look like this:

  • I do not know what completion means
  • I do not know who approves it
  • I do not know how much I can decide
  • I do not know whether this is more important than current work
  • I do not know the expected quality level
  • Conditions change later
  • I am corrected for things that were not defined
  • If I create a draft, I become the implementation owner

In this state, it is difficult to be proactive.

Initiative does not mean rushing forward without information.

Initiative requires decision materials and a clear scope of authority.


What Is the Value of a Person Who Creates Drafts?

A person who creates drafts has real value.

A draft is not just a document.

It turns vague ideas, verbal wishes, and abstract discussions into something that others can judge.

A draft maker does things such as:

  • Temporarily define the purpose
  • Clarify the audience
  • Separate issues
  • Create options
  • Make comparisons possible
  • Expose undefined areas
  • Help decision makers think
  • Align stakeholders
  • Turn abstract discussion into concrete discussion
  • Move meetings forward

This is valuable work.

When there is nothing concrete, people cannot discuss effectively.

A draft allows people to say:

  • This part is right
  • This part is wrong
  • This direction works
  • This area is undefined
  • This should be decided later
  • This part should not be implemented

In other words, the draft maker creates the ground for discussion.


Why Draft Makers Are Often Competent

People who can create drafts are often competent because draft creation requires several abilities.

1. Structuring Ambiguity

They can turn vague words such as:

“Make it nice.”
“Make it suitable for younger employees.”
“Make it easy to understand.”

into:

  • Who it is for
  • What should be communicated
  • What order makes sense
  • What should be removed
  • What needs confirmation

2. Finding Undefined Areas

A draft reveals what is undefined.

  • Purpose is unclear
  • Decision maker is unclear
  • Deadline is unclear
  • Implementation owner is unclear
  • Priority is unclear
  • Completion criteria are unclear

Finding these undefined areas is itself valuable.

3. Moving Discussion Forward

Verbal meetings easily become abstract.

A draft makes discussion concrete.

“Should we use this direction?”
“This part is wrong.”
“Let’s ask the decision maker.”

4. Reducing Rework

A draft is not the final product.

But it helps find direction gaps early.

This reduces the risk of major rework later.

5. Externalizing People’s Mental Images

A draft reveals what people were imagining.

“I imagined something different.”
“That was not my purpose.”
“We were not aligned.”

This is also valuable.


But a Draft Is Not Implementation Responsibility

This is important.

The fact that draft creation is valuable does not mean that the draft maker must implement everything until the end.

A draft should be:

  • A hypothesis for direction
  • Issue organization
  • Decision material
  • Pre-work before deciding implementation

But in many workplaces, this happens:

  1. Someone casually suggests an idea
  2. A competent person creates a draft
  3. The draft is criticized
  4. The person revises it
  5. More requests are added
  6. Implementation is pushed onto that person
  7. Someone else takes credit at the end

This is not draft creation.

This is draft exploitation.

Draft makers are valuable.

That is why drafting, reviewing, implementation, and responsibility must be separated.


Random Idea Outsourcing

Sometimes people throw undeveloped ideas to others.

“We should do this.”
“Just make a proposal.”
“Make it nice.”
“Make it suitable for young people.”
“And please implement it too.”

This is random idea outsourcing.

The person who had the idea should at least provide the basic assumptions.

## Minimum Set for Requesting a Draft

### 1. What do you want to do?
Example: Create a training video for new employees

### 2. Why now?
Example: Verbal explanations are too dependent on specific people

### 3. Who is it for?
Example: New employees, mid-career hires, field workers

### 4. What is the deliverable?
Example: One video, one SOP, one slide deck

### 5. When is it needed?
Example: Direction check by a specific meeting date

### 6. Who decides?
Example: Manager, department head, field leader

### 7. Who implements it?
Example: Undecided; to be assigned after draft review

### 8. Is it higher priority than existing work?
Example: Priority needs confirmation

Without this, it is risky to ask someone to move.

The person who has the idea does not always need to create the full draft.

But they should at least provide the assumptions.


Changing Requirements After the Fact Is Requirement Laundering

When work starts with vague instructions, later corrections increase.

First, someone says, “Make it nice.”
The employee guesses and creates something.
Then they hear, “That is not what I meant.”
They revise it.
New conditions appear.
Finally, they are told, “You did not understand.”

This is unhealthy.

Undefined requirements are being treated as the employee’s misunderstanding.

This is requirement laundering.

It means:

The requester failed to define the requirements, but the cost is shifted to the worker.

Not all changes are bad.

Work requirements can change.

But when they do, the following should be clarified:

  • What changed?
  • Why did it change?
  • How much additional work is required?
  • Should the deadline change?
  • Should the priority change?
  • Who made the decision?

Without this, people burn out.


Defensive Sentences for Draft Makers

If you create drafts, add boundaries.

For example:

I created this as a draft for direction confirmation.
The implementation scope, owner, decision maker, and deadline should be confirmed based on this draft.

Or:

I can create the draft.
However, if the purpose, audience, deliverable, deadline, decision maker, and priority are undefined, rework may increase. I would like to confirm those first.

Or more clearly:

I will prepare this as a direction-check document.
If we implement it, I would like to separately confirm scope, workload, and priority.

This reduces the risk of being automatically turned into the implementation owner.


Requirement Definition Template Before Delegation

## Request Checklist

### 1. Purpose
Why are we doing this?

### 2. Audience
Who is this for?

### 3. Deliverable
What should be completed?

### 4. Deadline
When is it needed?

### 5. Decision Maker
Who approves it?

### 6. Priority
Is this above existing work?

### 7. Constraints
Time, people, tools, and restrictions:

### 8. Scope
Included:
Not included:

### 9. Implementation
Draft only?
Implementation included?

### 10. If Requirements Change
Will deadline, workload, and priority be reviewed?

Filling this out reduces rework.


If You Use AI for Drafts, Human Assumptions Still Matter

AI can create drafts quickly.

From meeting notes, audio, bullet points, or rough memos, AI can organize:

  • Purpose
  • Audience
  • Issues
  • Undefined areas
  • Questions
  • Options
  • Output format
  • DOCX / PPTX / XLSX / TXT / Markdown

But even AI needs assumptions.

“Make it nice” is not enough for AI or humans.

At minimum, provide:

Purpose:
Audience:
Deliverable:
Deadline:
Decision maker:
Priority:
Constraints:
Output format:

Before throwing vague ideas to people, use AI to organize the assumptions.

This alone can reduce random idea outsourcing.


Conclusion: Define Requirements Before Blaming the Team

If your team is not moving, do not look only at their ability.

Look first at your request.

Did you define:

  • Purpose
  • Audience
  • Deliverable
  • Deadline
  • Decision maker
  • Priority
  • Constraints
  • Scope

If these are undefined, people cannot move easily.

“Make it nice” is not an instruction.

“Make it suitable for young people” is not a complete direction.

“Create a draft first” does not automatically include implementation responsibility.

Draft makers are valuable because they turn vague ideas into something people can judge.

That is exactly why drafting, reviewing, implementation, and responsibility must be separated.

If you want people to move, define the requirements first.

That reduces rework, protects initiative, and prevents draft exploitation.

Go one step deeper: Why Does One Department Keep Losing People When Company Turnover Is Low?

AdBooks on this topic

This article contains affiliate links (ads). About advertising As an Amazon Associate I earn from qualifying purchases.

If this article helped you, you can support the site. Support

Advertisement
Advertisement
Advertisement

One more? Anything fun?

Since you're done reading: a couple of nearby stories and some totally different, fun ones.

  1. Nearby1 in 8 Billion tier listwhat's the most unfair thing in the game, and what can you actually control?
  2. Slept Until 1 PMIs That Too Much Sleep? Worry Before a Big Change, Long Dreams, Air Conditioning
  3. Totally different, but funWhy Is Everyone in Chiikawa Always Eating?Food, Weeds, Monsters, Work and the 10+ Rating
  4. Don’t Misread the Signs Before ConfessingUpdating Beliefs and Testing Hypotheses
  5. Why Akita's Forest Doesn't Look Like JapanPostwar Cedar Plantations
  6. Why Hugs Feel Safe With Some People but Not Others

Read this today

Each one answers a question readers of this article tend to ask next.

Browse all articlesMore on Work

Find other articles

All articles

Mendoi-chan

Who runs this site

Mendoi-chan

She turns friction at work and in everyday life into clear structure and practical next steps.